Numbers come straight from your cost-calculator scenario — fill in the handful of blanks (your name is the important one). Everything you type saves into this page's link automatically, so bookmark or email the link to come back to the filled-out form; Download PDF bakes it into a document for the boss.
Process Improvement Report9/13/2026 | ||||||||||||||||||||||||||||||||||||||
Process Improvement ReportTooling & process change — test-cut results and annualized impact Company / Shop Department / Cell Date 9/13/2026 Improvement identified & test conducted by Title / Shift Result SummaryProjected annual savings — this job $10,781 Cycle time change −30% Tool life change +300% The JobPart / Job number Operation Material Machine Annual volume (parts/yr) 5,000 Test Comparison — Same Part, Same Machine
Annualized Impact
Recommendation & Next CandidatesPrepared by (signature) Reviewed by (supervisor) Adopted? (Y/N — date) Savings math: robbjack.com/machining-cost-calculator (from the figures entered by the user; estimates only, not guaranteed — validate on your part). Parameters verified with RobbJack applications engineering · Log the run at robbjack.com/log-a-run for a first-reorder credit through your distributor. |